IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NPL_2023_WBCS_V01_M / variable [F1]
central

World Bank Group Country Survey 2023

Nepal, 2023
Get Microdata
Reference ID
NPL_2023_WBCS_v01_M
Producer(s)
Public Opinion Research Group
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Feb 27, 2024
Last modified
Feb 27, 2024
Page views
5418
Downloads
210
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • nepal_fy23_cos_data

Transport: roads, bridges, sustainable transportation (B5_1)

Data file: nepal_fy23_cos_data

Overview

Valid: 486
Invalid: 11
Minimum: -99
Maximum: 11
Type: Discrete
Decimal: 0
Width: 20
Range: -99 - 11
Format: Numeric

Questions and instructions

Literal question
How EFFECTIVE has the WBG been at achieving development results in each of these areas of infrastructure in Nepal?
Categories
Value Category Cases
-99 13
2.7%
1 Not effective at all 4
0.8%
2 5
1%
3 14
2.9%
4 34
7%
5 58
11.9%
6 68
14%
7 65
13.4%
8 66
13.6%
9 34
7%
10 Very effective 20
4.1%
11 105
21.6%
Sysmiss 11
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.