IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / KGZ_2023_WBCS_V01_M / variable [F1]
central

World Bank Group Country Survey 2023

Kyrgyz Republic, 2023
Get Microdata
Reference ID
KGZ_2023_WBCS_v01_M
Producer(s)
Public Opinion Research Group
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Aug 28, 2024
Last modified
Aug 28, 2024
Page views
5775
Downloads
158
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • the_kyrgyz_republic_cos_fy23_data

Transport: roads, bridges, sustainable transportation, regional transport connectivity (B3_1)

Data file: the_kyrgyz_republic_cos_fy23_data

Overview

Valid: 210
Invalid: 6
Minimum: 1
Maximum: 11
Type: Discrete
Decimal: 0
Width: 20
Range: 1 - 11
Format: Numeric

Questions and instructions

Literal question
How EFFECTIVE has the WBG been in achieving development results in each of these areas of infrastructure in the Kyrgyz Republic?
Categories
Value Category Cases
1 Not effective at all 8
3.8%
2 5
2.4%
3 7
3.3%
4 5
2.4%
5 15
7.1%
6 13
6.2%
7 15
7.1%
8 12
5.7%
9 11
5.2%
10 Very effective 12
5.7%
11 107
51%
Sysmiss 6
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.