IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BWA_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Botswana, 2023
Get Microdata
Reference ID
BWA_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 10, 2025
Last modified
Jan 10, 2025
Page views
5625
Downloads
40
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Botswana-2023-full-data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Botswana-2023-full-data.dta

Overview

Valid: 37
Invalid: 585
Minimum: -9
Maximum: 120
Type: Discrete
Decimal: 0
Start: 172
End: 174
Width: 3
Range: -9 - 120
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 2
5.4%
-6 Still in process 0
0%
-5 Application denied 0
0%
1 One day or less 0
0%
2 1
2.7%
4 1
2.7%
7 3
8.1%
14 8
21.6%
21 1
2.7%
30 9
24.3%
60 5
13.5%
90 6
16.2%
120 1
2.7%
Sysmiss 585
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.