IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BWA_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Botswana, 2023
Get Microdata
Reference ID
BWA_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 10, 2025
Last modified
Jan 10, 2025
Page views
5595
Downloads
40
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Botswana-2023-full-data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Botswana-2023-full-data.dta

Overview

Valid: 27
Invalid: 595
Minimum: -6
Maximum: 180
Type: Discrete
Decimal: 0
Start: 214
End: 216
Width: 3
Range: -6 - 180
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 3
11.1%
-5 Application denied 0
0%
1 One day or less 0
0%
2 2
7.4%
3 2
7.4%
4 1
3.7%
5 1
3.7%
6 1
3.7%
7 2
7.4%
14 6
22.2%
15 1
3.7%
30 3
11.1%
45 1
3.7%
60 2
7.4%
90 1
3.7%
180 1
3.7%
Sysmiss 595
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.