IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / CAF_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Central African Republic, 2023
Get Microdata
Reference ID
CAF_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 10, 2025
Last modified
Jan 10, 2025
Page views
9308
Downloads
80
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Central-African-Republic-2023-full-data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Central-African-Republic-2023-full-data.dta

Overview

Valid: 38
Invalid: 113
Minimum: 1
Maximum: 90
Type: Discrete
Decimal: 0
Start: 164
End: 165
Width: 2
Range: 1 - 90
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 0
0%
-5 Application denied 0
0%
1 One day or less 15
39.5%
2 1
2.6%
4 1
2.6%
5 2
5.3%
6 3
7.9%
7 2
5.3%
8 3
7.9%
10 2
5.3%
14 2
5.3%
15 3
7.9%
30 2
5.3%
60 1
2.6%
90 1
2.6%
Sysmiss 113
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.