IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GHA_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Ghana, 2023 - 2024
Get Microdata
Reference ID
GHA_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 15, 2025
Last modified
Jan 15, 2025
Page views
5593
Downloads
55
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Ghana-2023-full-data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: Ghana-2023-full-data.dta

Overview

Valid: 64
Invalid: 649
Minimum: -9
Maximum: 365
Type: Discrete
Decimal: 0
Start: 1808
End: 1810
Width: 3
Range: -9 - 365
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 2
3.1%
-6 Still in process 11
17.2%
-5 Application denied 3
4.7%
1 One day or less 5
7.8%
2 1
1.6%
3 1
1.6%
5 3
4.7%
6 1
1.6%
7 4
6.3%
8 1
1.6%
14 3
4.7%
21 3
4.7%
30 12
18.8%
35 1
1.6%
36 1
1.6%
48 1
1.6%
60 4
6.3%
90 4
6.3%
120 1
1.6%
180 1
1.6%
365 1
1.6%
Sysmiss 649
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.