IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GHA_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Ghana, 2023 - 2024
Get Microdata
Reference ID
GHA_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 15, 2025
Last modified
Jan 15, 2025
Page views
5577
Downloads
55
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Ghana-2023-full-data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Ghana-2023-full-data.dta

Overview

Valid: 81
Invalid: 632
Minimum: -9
Maximum: 365
Type: Discrete
Decimal: 0
Start: 182
End: 184
Width: 3
Range: -9 - 365
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 7
8.6%
-6 Still in process 2
2.5%
-5 Application denied 0
0%
1 One day or less 17
21%
2 3
3.7%
3 6
7.4%
4 1
1.2%
5 2
2.5%
7 1
1.2%
12 1
1.2%
14 5
6.2%
15 1
1.2%
16 1
1.2%
20 1
1.2%
21 2
2.5%
25 1
1.2%
28 1
1.2%
30 9
11.1%
31 1
1.2%
34 1
1.2%
35 1
1.2%
40 3
3.7%
50 1
1.2%
60 5
6.2%
62 1
1.2%
90 1
1.2%
120 3
3.7%
180 2
2.5%
365 1
1.2%
Sysmiss 632
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.