IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GHA_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Ghana, 2023 - 2024
Get Microdata
Reference ID
GHA_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 15, 2025
Last modified
Jan 15, 2025
Page views
5637
Downloads
55
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Ghana-2023-full-data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Ghana-2023-full-data.dta

Overview

Valid: 51
Invalid: 662
Minimum: -9
Maximum: 180
Type: Discrete
Decimal: 0
Start: 228
End: 230
Width: 3
Range: -9 - 180
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 1
2%
-6 Still in process 2
3.9%
-5 Application denied 0
0%
1 One day or less 19
37.3%
3 2
3.9%
4 1
2%
5 2
3.9%
6 1
2%
7 1
2%
10 3
5.9%
12 1
2%
13 1
2%
14 4
7.8%
16 1
2%
18 1
2%
21 2
3.9%
30 3
5.9%
35 1
2%
45 1
2%
60 3
5.9%
180 1
2%
Sysmiss 662
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.