IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GRC_2018-2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2018-2023

Greece, 2018 - 2023
Get Microdata
Reference ID
GRC_2018-2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 15, 2025
Last modified
Jan 15, 2025
Page views
7765
Downloads
152
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Greece_2018_2023.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Greece_2018_2023.dta

Overview

Valid: 22
Invalid: 1178
Minimum: -9
Maximum: 40
Type: Discrete
Decimal: 0
Start: 450
End: 451
Width: 2
Range: -9 - 40
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 1
4.5%
-6 Still in process 2
9.1%
-5 Application denied 1
4.5%
1 One day or less 1
4.5%
2 1
4.5%
3 1
4.5%
5 2
9.1%
9 1
4.5%
10 3
13.6%
15 2
9.1%
22 1
4.5%
25 1
4.5%
30 4
18.2%
40 1
4.5%
Sysmiss 1178
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.