IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / HKG_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Hong Kong SAR, China, 2023
Get Microdata
Reference ID
HKG_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 15, 2025
Last modified
Jan 15, 2025
Page views
6060
Downloads
60
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Hong-Kong-SAR-China-2023-full-data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Hong-Kong-SAR-China-2023-full-data.dta

Overview

Valid: 87
Invalid: 511
Minimum: -9
Maximum: 30
Mean: 0.310344827586207
Standard deviation: 6.65129878002084
Type: Discrete
Decimal: 0
Width: 24
Range: -9 - 30
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 16
18.4%
-6 Still in process 1
1.1%
-5 Application denied 0
0%
1 One day or less 60
69%
2 1
1.1%
3 2
2.3%
4 1
1.1%
7 2
2.3%
14 1
1.1%
17 1
1.1%
30 2
2.3%
Sysmiss 511
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.