IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LSO_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Lesotho, 2023
Get Microdata
Reference ID
LSO_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 15, 2025
Last modified
Jan 15, 2025
Page views
5457
Downloads
40
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Lesotho-2023-full-data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Lesotho-2023-full-data.dta

Overview

Valid: 6
Invalid: 144
Minimum: 21
Maximum: 90
Type: Discrete
Decimal: 0
Start: 156
End: 157
Width: 2
Range: 21 - 90
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 0
0%
-5 Application denied 0
0%
1 One day or less 0
0%
21 1
16.7%
30 3
50%
60 1
16.7%
90 1
16.7%
Sysmiss 144
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.