IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LSO_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Lesotho, 2023
Get Microdata
Reference ID
LSO_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 15, 2025
Last modified
Jan 15, 2025
Page views
5438
Downloads
40
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Lesotho-2023-full-data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Lesotho-2023-full-data.dta

Overview

Valid: 12
Invalid: 138
Minimum: -6
Maximum: 120
Type: Discrete
Decimal: 0
Start: 194
End: 196
Width: 3
Range: -6 - 120
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 3
25%
-5 Application denied 0
0%
1 One day or less 2
16.7%
3 1
8.3%
7 1
8.3%
14 1
8.3%
20 1
8.3%
30 1
8.3%
78 1
8.3%
120 1
8.3%
Sysmiss 138
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.