IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MUS_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Mauritius, 2023 - 2024
Get Microdata
Reference ID
MUS_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 17, 2025
Last modified
Jan 17, 2025
Page views
7899
Downloads
47
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Mauritius-2023-full-data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: Mauritius-2023-full-data.dta

Overview

Valid: 43
Invalid: 310
Minimum: -9
Maximum: 365
Type: Discrete
Decimal: 0
Start: 1767
End: 1769
Width: 3
Range: -9 - 365
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 2
4.7%
-6 Still in process 10
23.3%
-5 Application denied 2
4.7%
1 One day or less 0
0%
7 1
2.3%
15 1
2.3%
21 3
7%
30 8
18.6%
60 6
14%
90 4
9.3%
180 4
9.3%
365 2
4.7%
Sysmiss 310
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.