IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MAR_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Morocco, 2023
Get Microdata
Reference ID
MAR_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 17, 2025
Last modified
Jan 17, 2025
Page views
8400
Downloads
52
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Morocco-2023-full-data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Morocco-2023-full-data.dta

Overview

Valid: 12
Invalid: 586
Minimum: 1
Maximum: 120
Type: Discrete
Decimal: 0
Start: 171
End: 173
Width: 3
Range: 1 - 120
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 0
0%
-5 Application denied 0
0%
1 One day or less 1
8.3%
2 1
8.3%
3 1
8.3%
4 5
41.7%
13 1
8.3%
17 1
8.3%
20 1
8.3%
120 1
8.3%
Sysmiss 586
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.