IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NPL_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Nepal, 2023
Get Microdata
Reference ID
NPL_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 17, 2025
Last modified
Jan 21, 2025
Page views
4666
Downloads
42
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Nepal-2023-full-data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Nepal-2023-full-data.dta

Overview

Valid: 45
Invalid: 537
Minimum: 1
Maximum: 180
Type: Discrete
Decimal: 0
Start: 165
End: 167
Width: 3
Range: 1 - 180
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 0
0%
-5 Application denied 0
0%
1 One day or less 1
2.2%
2 2
4.4%
3 3
6.7%
4 1
2.2%
5 2
4.4%
6 2
4.4%
7 6
13.3%
10 4
8.9%
12 1
2.2%
13 1
2.2%
14 2
4.4%
15 5
11.1%
16 1
2.2%
25 1
2.2%
30 5
11.1%
35 1
2.2%
45 2
4.4%
60 1
2.2%
90 2
4.4%
180 2
4.4%
Sysmiss 537
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.