IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NPL_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Nepal, 2023
Get Microdata
Reference ID
NPL_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 17, 2025
Last modified
Jan 21, 2025
Page views
4659
Downloads
42
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Nepal-2023-full-data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Nepal-2023-full-data.dta

Overview

Valid: 11
Invalid: 571
Minimum: -6
Maximum: 45
Type: Discrete
Decimal: 0
Start: 209
End: 210
Width: 2
Range: -6 - 45
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 2
18.2%
-5 Application denied 0
0%
1 One day or less 0
0%
2 1
9.1%
3 1
9.1%
5 1
9.1%
7 1
9.1%
15 1
9.1%
20 1
9.1%
30 2
18.2%
45 1
9.1%
Sysmiss 571
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.