IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NPL_2009-2013-2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2009-2023

Nepal, 2009 - 2023
Get Microdata
Reference ID
NPL_2009-2013-2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 22, 2025
Last modified
Jan 29, 2025
Page views
7413
Downloads
239
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Nepal_2009_2013_2023.dta

Average Length Of Water Shortages (Affecting Production) In Last Fiscal Year (_2009_2013_c17)

Data file: Nepal_2009_2013_2023.dta

Overview

Valid: 32
Invalid: 1400
Minimum: -9
Maximum: 72
Mean: 13.90625
Standard deviation: 16.8950448452373
Type: Discrete
Decimal: 0
Width: 8
Range: -9 - 72
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know 2
6.3%
1 5
15.6%
2 6
18.8%
4 1
3.1%
5 1
3.1%
7 1
3.1%
8 1
3.1%
14 1
3.1%
20 2
6.3%
24 9
28.1%
32 1
3.1%
48 1
3.1%
72 1
3.1%
Sysmiss 1400
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.