IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NPL_2009-2013-2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2009-2023

Nepal, 2009 - 2023
Get Microdata
Reference ID
NPL_2009-2013-2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 22, 2025
Last modified
Jan 29, 2025
Page views
7226
Downloads
239
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Nepal_2009_2013_2023.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Nepal_2009_2013_2023.dta

Overview

Valid: 104
Invalid: 1328
Minimum: -9
Maximum: 180
Mean: 20.7788461538462
Standard deviation: 37.2115330099013
Type: Discrete
Decimal: 0
Width: 24
Range: -9 - 180
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 1
1%
-6 Still in process 10
9.6%
-5 Application denied 0
0%
1 One day or less 12
11.5%
2 3
2.9%
3 5
4.8%
4 2
1.9%
5 3
2.9%
6 3
2.9%
7 9
8.7%
10 6
5.8%
12 3
2.9%
13 1
1%
14 3
2.9%
15 14
13.5%
16 1
1%
21 1
1%
25 1
1%
30 13
12.5%
35 1
1%
45 3
2.9%
60 2
1.9%
90 3
2.9%
180 4
3.8%
Sysmiss 1328
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.