IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NPL_2009-2013-2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2009-2023

Nepal, 2009 - 2023
Get Microdata
Reference ID
NPL_2009-2013-2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 22, 2025
Last modified
Jan 29, 2025
Page views
7201
Downloads
239
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Nepal_2009_2013_2023.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Nepal_2009_2013_2023.dta

Overview

Valid: 19
Invalid: 1413
Minimum: -6
Maximum: 45
Mean: 10.3684210526316
Standard deviation: 14.5189934083132
Type: Discrete
Decimal: 0
Width: 24
Range: -6 - 45
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 4
21.1%
-5 Application denied 0
0%
1 One day or less 0
0%
2 1
5.3%
3 2
10.5%
5 1
5.3%
7 4
21.1%
10 1
5.3%
15 1
5.3%
20 1
5.3%
30 3
15.8%
45 1
5.3%
Sysmiss 1413
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.