IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PHL_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Philippines, 2023 - 2024
Get Microdata
Reference ID
PHL_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 22, 2025
Last modified
Jan 22, 2025
Page views
6207
Downloads
46
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Philippines-2023-full-data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: Philippines-2023-full-data.dta

Overview

Valid: 130
Invalid: 872
Minimum: -9
Maximum: 365
Type: Discrete
Decimal: 0
Start: 1676
End: 1678
Width: 3
Range: -9 - 365
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 12
9.2%
-6 Still in process 11
8.5%
-5 Application denied 1
0.8%
1 One day or less 11
8.5%
2 3
2.3%
3 7
5.4%
4 1
0.8%
5 6
4.6%
6 1
0.8%
7 16
12.3%
10 5
3.8%
14 5
3.8%
15 4
3.1%
20 5
3.8%
21 1
0.8%
24 1
0.8%
30 31
23.8%
45 2
1.5%
60 2
1.5%
90 2
1.5%
120 1
0.8%
180 1
0.8%
365 1
0.8%
Sysmiss 872
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.