IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PRT_2023_WBES_V01_M / variable [F2]
central

World Bank Enterprise Survey 2023

Portugal, 2023 - 2024
Get Microdata
Reference ID
PRT_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
DDI/XML JSON
Study website
Created on
Jan 22, 2025
Last modified
Jan 22, 2025
Page views
15766
Downloads
113
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Portugal-2023-full-data.dta
  • Portugal-2023-expanded.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Portugal-2023-expanded.dta

Overview

Valid: 60
Invalid: 947
Minimum: -9
Maximum: 150
Type: Discrete
Decimal: 0
Start: 285
End: 287
Width: 3
Range: -9 - 150
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 4
6.7%
-6 Still in process 1
1.7%
-5 Application denied 1
1.7%
1 One day or less 2
3.3%
2 1
1.7%
3 5
8.3%
4 1
1.7%
5 5
8.3%
7 11
18.3%
8 1
1.7%
10 1
1.7%
15 6
10%
20 1
1.7%
22 1
1.7%
30 12
20%
60 2
3.3%
90 3
5%
120 1
1.7%
150 1
1.7%
Sysmiss 947
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.