IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PRT_2023_WBES_V01_M / variable [F2]
central

World Bank Enterprise Survey 2023

Portugal, 2023 - 2024
Get Microdata
Reference ID
PRT_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
DDI/XML JSON
Study website
Created on
Jan 22, 2025
Last modified
Jan 22, 2025
Page views
15686
Downloads
113
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Portugal-2023-full-data.dta
  • Portugal-2023-expanded.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: Portugal-2023-expanded.dta

Overview

Valid: 120
Invalid: 887
Minimum: -9
Maximum: 730
Type: Discrete
Decimal: 0
Start: 1452
End: 1454
Width: 3
Range: -9 - 730
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 3
2.5%
-6 Still in process 26
21.7%
-5 Application denied 1
0.8%
1 One day or less 0
0%
3 1
0.8%
5 1
0.8%
7 3
2.5%
14 1
0.8%
15 1
0.8%
21 1
0.8%
25 2
1.7%
30 9
7.5%
31 1
0.8%
35 1
0.8%
45 1
0.8%
60 11
9.2%
90 12
10%
120 4
3.3%
150 1
0.8%
180 17
14.2%
240 3
2.5%
300 1
0.8%
350 1
0.8%
360 2
1.7%
362 1
0.8%
365 8
6.7%
450 1
0.8%
500 1
0.8%
730 5
4.2%
Sysmiss 887
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.