IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PRT_2019-2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2019-2023

Portugal, 2018 - 2024
Get Microdata
Reference ID
PRT_2019-2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 22, 2025
Last modified
Jan 22, 2025
Page views
8355
Downloads
227
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Portugal_2019_2023.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: Portugal_2019_2023.dta

Overview

Valid: 211
Invalid: 1858
Minimum: -9
Maximum: 730
Type: Discrete
Decimal: 0
Start: 1767
End: 1769
Width: 3
Range: -9 - 730
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 13
6.2%
-6 Still in process 38
18%
-5 Application denied 2
0.9%
1 One day or less 2
0.9%
3 1
0.5%
4 1
0.5%
5 1
0.5%
7 7
3.3%
14 1
0.5%
15 4
1.9%
21 1
0.5%
25 2
0.9%
30 22
10.4%
31 1
0.5%
35 1
0.5%
45 4
1.9%
48 1
0.5%
60 26
12.3%
75 1
0.5%
90 20
9.5%
100 1
0.5%
120 7
3.3%
150 2
0.9%
180 20
9.5%
240 4
1.9%
300 1
0.5%
350 2
0.9%
360 3
1.4%
362 1
0.5%
365 9
4.3%
450 1
0.5%
500 2
0.9%
545 1
0.5%
712 1
0.5%
730 7
3.3%
Sysmiss 1858
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.