IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PRT_2019-2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2019-2023

Portugal, 2018 - 2024
Get Microdata
Reference ID
PRT_2019-2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 22, 2025
Last modified
Jan 22, 2025
Page views
8232
Downloads
227
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Portugal_2019_2023.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Portugal_2019_2023.dta

Overview

Valid: 104
Invalid: 1965
Minimum: -9
Maximum: 180
Type: Discrete
Decimal: 0
Start: 456
End: 458
Width: 3
Range: -9 - 180
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 7
6.7%
-6 Still in process 1
1%
-5 Application denied 1
1%
1 One day or less 8
7.7%
2 7
6.7%
3 7
6.7%
4 2
1.9%
5 10
9.6%
7 12
11.5%
8 8
7.7%
10 3
2.9%
15 11
10.6%
20 2
1.9%
22 1
1%
30 15
14.4%
40 1
1%
60 2
1.9%
90 3
2.9%
120 1
1%
150 1
1%
180 1
1%
Sysmiss 1965
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.