IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Rwanda, 2023 - 2024
Get Microdata
Reference ID
RWA_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 24, 2025
Last modified
Jan 24, 2025
Page views
5670
Downloads
67
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Rwanda-2023-full-data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Rwanda-2023-full-data.dta

Overview

Valid: 36
Invalid: 322
Minimum: -6
Maximum: 365
Type: Discrete
Decimal: 0
Start: 361
End: 363
Width: 3
Range: -6 - 365
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 2
5.6%
-5 Application denied 0
0%
1 One day or less 0
0%
2 2
5.6%
3 3
8.3%
5 2
5.6%
7 3
8.3%
14 1
2.8%
23 1
2.8%
25 1
2.8%
27 1
2.8%
30 7
19.4%
35 1
2.8%
37 1
2.8%
40 1
2.8%
45 3
8.3%
60 2
5.6%
65 1
2.8%
90 2
5.6%
150 1
2.8%
365 1
2.8%
Sysmiss 322
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.