IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IRQ_2022_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2022

Iraq, 2022 - 2023
Get Microdata
Reference ID
IRQ_2022_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Feb 06, 2025
Last modified
Feb 06, 2025
Page views
8445
Downloads
95
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Iraq-2022-full-data.dta

Typical number of days to receive payment under govt contract (j43_BR)

Data file: Iraq-2022-full-data.dta

Overview

Valid: 79
Invalid: 940
Minimum: -9
Maximum: 500
Type: Discrete
Decimal: 0
Start: 2676
End: 2678
Width: 3
Range: -9 - 500
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 8
10.1%
1 Less than one day 0
0%
7 6
7.6%
10 1
1.3%
15 10
12.7%
20 9
11.4%
25 2
2.5%
30 17
21.5%
35 1
1.3%
50 1
1.3%
60 9
11.4%
80 1
1.3%
90 7
8.9%
100 1
1.3%
300 4
5.1%
500 2
2.5%
Sysmiss 940
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.