IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GNQ_2024_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2024

Equatorial Guinea, 2024
Get Microdata
Reference ID
GNQ_2024_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 20, 2025
Last modified
May 20, 2025
Page views
594
Downloads
9
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Equatorial-Guinea-2024-full-data.dta

Typical number of days to receive payment under govt contract (j43)

Data file: Equatorial-Guinea-2024-full-data.dta

Overview

Valid: 62
Invalid: 111
Minimum: 1
Maximum: 1095
Type: Discrete
Decimal: 0
Start: 1464
End: 1467
Width: 4
Range: 1 - 1095
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 NO PAYMENT HAS YET BEEN RECEIVED 0
0%
1 Less than one day 1
1.6%
4 1
1.6%
5 2
3.2%
7 11
17.7%
10 3
4.8%
14 2
3.2%
15 10
16.1%
20 3
4.8%
25 1
1.6%
28 1
1.6%
30 18
29%
40 1
1.6%
60 6
9.7%
365 1
1.6%
1095 1
1.6%
Sysmiss 111
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.