IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PNG_2024_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2024

Papua New Guinea, 2024 - 2025
Get Microdata
Reference ID
PNG_2024_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 20, 2025
Last modified
May 20, 2025
Page views
796
Downloads
6
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Papua-New-Guinea-2024-full-data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: Papua-New-Guinea-2024-full-data.dta

Overview

Valid: 24
Invalid: 121
Minimum: -9
Maximum: 180
Type: Discrete
Decimal: 0
Start: 802
End: 804
Width: 3
Range: -9 - 180
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 3
12.5%
-6 Still in process 3
12.5%
-5 Application denied 0
0%
1 One day or less 3
12.5%
7 1
4.2%
14 3
12.5%
15 2
8.3%
18 1
4.2%
21 2
8.3%
30 1
4.2%
42 1
4.2%
90 1
4.2%
150 1
4.2%
180 2
8.3%
Sysmiss 121
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.