IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PNG_2024_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2024

Papua New Guinea, 2024 - 2025
Get Microdata
Reference ID
PNG_2024_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 20, 2025
Last modified
May 20, 2025
Page views
965
Downloads
6
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Papua-New-Guinea-2024-full-data.dta

Typical number of days to receive payment under govt contract (j43)

Data file: Papua-New-Guinea-2024-full-data.dta

Overview

Valid: 26
Invalid: 119
Minimum: -9
Maximum: 210
Type: Discrete
Decimal: 0
Start: 1036
End: 1038
Width: 3
Range: -9 - 210
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 6
23.1%
-6 NO PAYMENT HAS YET BEEN RECEIVED 5
19.2%
1 Less than one day 2
7.7%
10 1
3.8%
14 2
7.7%
21 1
3.8%
28 1
3.8%
30 3
11.5%
180 3
11.5%
190 1
3.8%
210 1
3.8%
Sysmiss 119
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.