IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PNG_2024_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2024

Papua New Guinea, 2024 - 2025
Get Microdata
Reference ID
PNG_2024_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 20, 2025
Last modified
May 20, 2025
Page views
870
Downloads
6
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Papua-New-Guinea-2024-full-data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Papua-New-Guinea-2024-full-data.dta

Overview

Valid: 24
Invalid: 121
Minimum: -9
Maximum: 60
Type: Discrete
Decimal: 0
Start: 153
End: 154
Width: 2
Range: -9 - 60
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 3
12.5%
-6 Still in process 1
4.2%
-5 Application denied 0
0%
1 One day or less 2
8.3%
3 1
4.2%
7 2
8.3%
10 3
12.5%
14 3
12.5%
16 1
4.2%
17 1
4.2%
18 1
4.2%
20 3
12.5%
30 1
4.2%
48 1
4.2%
60 1
4.2%
Sysmiss 121
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.