IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SEN_2024_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2024

Senegal, 2024 - 2025
Get Microdata
Reference ID
SEN_2024_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 21, 2025
Last modified
May 21, 2025
Page views
756
Downloads
18
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Senegal-2024-full-data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Senegal-2024-full-data.dta

Overview

Valid: 16
Invalid: 587
Minimum: 5
Maximum: 150
Type: Discrete
Decimal: 0
Start: 184
End: 186
Width: 3
Range: 5 - 150
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 0
0%
-5 Application denied 0
0%
1 One day or less 0
0%
5 1
6.3%
6 1
6.3%
7 2
12.5%
15 1
6.3%
20 3
18.8%
28 1
6.3%
30 5
31.3%
60 1
6.3%
150 1
6.3%
Sysmiss 587
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.