IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / COD_2024_ESM_V01_M / variable [F1]
central

Enterprise Survey of Micro Firms 2024

Congo, Dem. Rep., 2024
Get Microdata
Reference ID
COD_2024_ESM_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 23, 2025
Last modified
May 23, 2025
Page views
860
Downloads
10
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • DRCmicro-2024-full-data.dta

Main reason the establishment didn't apply for a construction permit? (DRCg3)

Data file: DRCmicro-2024-full-data.dta

Overview

Valid: 1047
Invalid: 49
Minimum: -9
Maximum: 6
Type: Discrete
Decimal: 0
Start: 667
End: 668
Width: 2
Range: -9 - 6
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 2
0.2%
1 No need to apply 685
65.4%
2 Application procedures were complex 79
7.5%
3 Getting a construction permit takes too long 78
7.4%
4 Cost associated getting construction permit is too high 119
11.4%
5 To avoid corruption 6
0.6%
6 Other 78
7.4%
Sysmiss 49
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.