IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / COD_2024_ESM_V01_M / variable [F1]
central

Enterprise Survey of Micro Firms 2024

Congo, Dem. Rep., 2024
Get Microdata
Reference ID
COD_2024_ESM_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 23, 2025
Last modified
May 23, 2025
Page views
819
Downloads
10
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • DRCmicro-2024-full-data.dta

Main reason why this establishment did not apply for electricity connection (DRCc4)

Data file: DRCmicro-2024-full-data.dta

Overview

Valid: 186
Invalid: 910
Minimum: -9
Maximum: 6
Type: Discrete
Decimal: 0
Start: 257
End: 258
Width: 2
Range: -9 - 6
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 1
0.5%
1 High cost of official connection 62
33.3%
2 Application procedures were complex 19
10.2%
3 Getting electricity takes too long 31
16.7%
4 Corruption within the utilitiy service 5
2.7%
5 Electrical grid is not available in the area 4
2.2%
6 Other 64
34.4%
Sysmiss 910
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.