IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / KSV_2009_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2009

Kosovo, 2008 - 2009
Get Microdata
Reference ID
KSV_2009_ES_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Created on
Dec 19, 2011
Last modified
Mar 29, 2019
Page views
20093
Downloads
1336
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Kosovo2009_idstd

how many days did it take for you to obtain a construction-related permit? (g3)

Data file: Kosovo2009_idstd

Overview

Valid: 41
Invalid: 229
Type: Discrete
Decimal: 0
Start: 623
End: 624
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category
-9 don't know
-6 still in process
-5 application denied
1 less than one day
4
7
10
12
15
30
40
60
70
80
90
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Waiting time for construction permit. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.