IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / KSV_2009_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2009

Kosovo, 2008 - 2009
Get Microdata
Reference ID
KSV_2009_ES_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Created on
Dec 19, 2011
Last modified
Mar 29, 2019
Page views
20169
Downloads
1336
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Kosovo2009_idstd

how many days did it take for you to receive an electrical connection service? (c4)

Data file: Kosovo2009_idstd

Overview

Valid: 35
Invalid: 235
Type: Discrete
Decimal: 0
Start: 281
End: 283
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 don't know
-6 still in process
-5 application denied
1 less than one day
3
7
10
12
20
25
30
35
40
60
90
150
360
365
650
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for electrical connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.