Interviewer instructions
30. General explanation about questions 41 through 56
Fill question 41 only for normal settled households and leave it blank for other households. But fill questions 42 to 55 also for collective households in addition to normal settled ones.
Note: For those normal settled and collective households for which you filled more than one sheet of questionnaire, fill these questions along with question 56 only on the first sheet and leave them blank on other sheets.
35. General explanation about Questions 45 through 55
Fill these questions only for those households who live in a conventional residential unit (box 1 question 44) and leave it blank for households living in other types of units.
38. Facilities and utilities, Question 47
Different types of facilities and utilities are mentioned in this question. First, ask about the existence of these facilities and utilities in the housing unit and mark either box 1 or 2 in section A. Then, ask about each facility and utility available in the unit (box 1 in section A) separately and whether the household takes advantage of it or not. If yes, mark 1 in section B, otherwise mark 2. For those facilities and utilities not available in the housing unit (box 2 in section A), leave section B blank. Note the following in order to fill this question:
- For electricity, private generators in units are not what is meant, but the electricity available to everyone is.
- For piped water, the important aspect is for the unit to have a pipeline and for the water in the pipeline to be connected to the public water network.
- For piped gas, the important aspect is for the unit to have a pipeline and for the gas in the pipeline to be connected to the public gas network.
- A central heating system, which also includes a package, is a system in which heat is produced in one defined part and is transferred from that point to the entire housing unit.
- A central air conditioning system is a system in which heat or cold air is produced in a specific part and then transferred to the entire housing unit.
Note: for electricity, central heating system, central air conditioning system and bathroom, the point is only to ask for the existence of it.