IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IRQ_2011_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2011

Iraq, 2011
Get Microdata
Reference ID
IRQ_2011_ES_v01_M_WB
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Dec 20, 2012
Last modified
Mar 29, 2019
Page views
18099
Downloads
2055
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Iraq-2011-full-data-

If this establishment had to hypothetically purchase land and buildings in use n (IQn7b)

Data file: Iraq-2011-full-data-

Overview

Valid: 480
Invalid: 276
Minimum: 2300000
Maximum: 30000000000
Mean: 397429791.667
Standard deviation: 1753995077.409
Type: Continuous
Decimal: 0
Start: 872
End: 882
Width: 11
Range: -
Format:

Questions and instructions

Literal question
If this establishment had to hypothetically purchase the land and buildings, and machinery and equipment in use now, as they are in their current condition, how much would it cost to purchase each of the following?
Land and buildings
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.