IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RUS_2012_ES_V01_M_WB / variable [F2]
central

Enterprise Survey 2012

Russian Federation, 2011 - 2012
Get Microdata
Reference ID
RUS_2012_ES_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Created on
Mar 24, 2013
Last modified
Mar 29, 2019
Page views
14753
Downloads
1625
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Russia-2012-full
    data

Submit application to obtain an electrical connection over last 2 yrs? (c3)

Data file: Russia-2012-full data

Overview

Valid: 4220
Invalid: 0
Type: Discrete
Decimal: 0
Start: 858
End: 871
Width: 14
Range: -
Format:

Questions and instructions

Question pretext
READ THE FOLLOWING TO THE RESPONDENT BEFORE PROCEEDING. Now, we turn to the establishment's operations in fiscal year [insert last complete fiscal year].
Literal question
Over the last two years, did this establishment submit an application to obtain an electrical connection?
Categories
Value Category
-9 Don't know
-8 Refusal
-7 Does not apply
1 Yes
2 No
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Application for electrical connection.
Electrical connection refers to a new connection or to an increase in voltage of an existing connection that requires an application.
Question post text
If answer is No or Don't Know then GO TO QUESTION C.6
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.