IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LKA_2004_CI2L_V01_M / variable [F8]
central

Census of Industry 2004

Sri Lanka, 2003
Get Microdata
Reference ID
LKA_2004_CI2L_v01_M
Producer(s)
Department of Census and Statistics
Metadata
DDI/XML JSON
Study website
Created on
Sep 15, 2013
Last modified
Mar 29, 2019
Page views
26960
Downloads
1061
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Section1
  • Section 2
  • Section3
  • Section41
  • Section42
  • Section43
  • Section5
  • Section6
  • Section7

6.2.5 Value(Rs.'000) (Q625)

Data file: Section6

Overview

Valid: 0
Invalid: 0
Type: Continuous
Decimal: 0
Start: 443
End: 449
Width: 7
Range: -
Format:

Questions and instructions

Question pretext
Include the cost of all equipment (including plant etc.) building and other constructions manufactured or build by the establishment for its own use during the census reference period. as well as the costs of extensions, alterations, improvements and major repairs carried out by this establishment with own labour which prolong the life of existing fixed assets. Valuation should be at producers' prices or at direct cost plus appropriate portion of overheads.
Literal question
Total cost of own-account fixed assets produced
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.