IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / AFG_2008_INS_V01_M_WB / variable [F1]
central

Informal Survey 2008

Afghanistan, 2008
Get Microdata
Reference ID
AFG_2008_InS_v01_M_WB
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
55595
Downloads
6578
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Afghanistan_idstd_Informal

how many days did it take for you to obtain a construction-related permit? (g3)

Data file: Afghanistan_idstd_Informal

Overview

Valid: 22
Invalid: 397
Type: Discrete
Decimal: 0
Start: 735
End: 737
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category
-9 don’t know
-6 still in process
-5 application denied
1
5
7
10
15
20
30
60
365
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Waiting time for construction permit. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.