IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / AGO_2010_INS_V01_M_WB / variable [F2]
central

Informal Survey 2010

Angola, 2010
Get Microdata
Reference ID
AGO_2010_InS_v01_M_WB
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
15006
Downloads
1124
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Angola-2010-Informal-full
    data-

n1c. Total costs of electricity including fuel for generators (n1c)

Data file: Angola-2010-Informal-full data-

Overview

Valid: 66
Invalid: 53
Minimum: 0
Maximum: 98000000
Mean: 5148303.03
Standard deviation: 15427416.005
Type: Continuous
Decimal: 0
Start: 628
End: 635
Width: 8
Range: -
Format:

Questions and instructions

Literal question
For last month, please provide the following information about this business:
Total costs of electricity including fuel for generators
Categories
Value Category
-9 Don’t know (spontaneous)
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.