IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ARG_2010_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2010

Argentina, 2010 - 2011
Get Microdata
Reference ID
ARG_2010_ES_v01_M_WB
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website Interactive tools
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
30014
Downloads
1874
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Argentina-2010-full
    data-

Total Annual Costs Of Electricity In Last Fiscal Year (n2b)

Data file: Argentina-2010-full data-

Overview

Valid: 911
Invalid: 143
Type: Discrete
Decimal: 0
Start: 890
End: 899
Width: 10
Range: -
Format:

Questions and instructions

Question pretext
SHOW CARD
READ OUT
Literal question
For fiscal year [insert last complete fiscal year], please provide the following information about this establishment:
Total annual costs of electricity
Categories
Value Category
-9 Don’t know
0
1200
1390
1500
2000
2200
2249
2500
2547
3000
3600
3800
4000
4200
4300
4450
4500
4800
5000
5770
5800
6000
6500
6760
6788
7000
7200
7320
7450
7537
7600
8000
8400
8553
8900
9000
9535
9600
10000
10200
10800
11000
11400
11524
11715
12000
12385
12700
13000
13106
13161
13200
13800
14000
14044
14280
14445
15000
15700
15834
16000
16636
16800
16940
17099
18000
18500
18530
18890
19000
19307
19600
19774
20000
21000
21647
22000
22376
23000
23400
23560
23733
24000
24300
25000
25327
26000
26699
27000
27717
27964
28000
28715
29824
30000
30115
32190
33000
34905
35000
35578
36000
38000
39000
39789
40000
42000
43000
45000
45600
45712
46549
48000
48728
49874
50000
50418
51330
52000
52415
54050
54885
54971
56000
58000
59028
60000
61448
62000
64000
64903
65000
66000
66430
67200
68300
69000
69177
70000
70426
71385
72000
73959
75000
76500
77800
78000
79879
80000
83000
84512
86000
89250
90000
93000
93351
96000
98000
100000
107579
108000
108728
110000
117075
119975
120000
124934
125000
126000
130000
140000
141000
142000
143000
144000
147196
149000
150000
151000
152000
157800
158380
160000
162097
165000
170000
171529
175000
177000
180000
185451
187000
190000
192000
194715
200000
204000
206000
210000
220000
220013
224487
240000
242984
246000
250000
258830
270889
271000
287778
288000
289473
297000
298775
300000
312000
320000
322000
325000
332000
336000
339000
350000
353000
354552
360000
380000
387168
387686
389095
400000
416000
425000
430000
450000
467976
470000
480000
490000
500000
512000
530000
540000
550000
560000
562000
584000
598000
600000
628000
666000
674000
700000
718000
720000
761000
800000
803536
805000
812500
813010
822000
840000
845000
849000
850000
900000
911000
960000
990000
1000000
1050000
1080000
1100000
1124944
1152000
1158000
1164000
1190480
1200000
1264143
1287000
1300000
1419000
1459851
1500000
1600000
1636825
1740000
1750000
1759463
1800000
1843689
1872164
1886000
1898000
1900000
2000000
2200000
2213069
2295000
2300000
2355977
2370522
2478000
2500000
2532668
2570353
2600000
2779000
2895003
2900000
2906373
2994831
3000000
3009285
3100000
3400000
3500000
3600000
3673619
3911000
4000000
4100000
4471422
4500000
5000000
5112000
5182319
5410469
5500000
6000000
6500000
6730000
6948000
7000000
7200000
7300000
7515495
8600000
8860393
9000000
10000000
10419278
10911854
11500000
12000000
12385548
13000000
14000000
14114153
15000000
15892481
16000000
17000000
18500000
19000000
19033324
20000000
24000000
28287000
30000000
32000000
32804000
40000000
43000000
48873000
50000000
53500000
54267000
80000000
84000000
94000000
104000000
112769332
131871683
168000000
172122577
180000000
278000000
367604000
380000000
2200000000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Total cost of labor, including wages, salaries and benefits is the total annual wages and all annual benefits, including food, transport, social security (i.e. pensions, medical insurance, and unemployment insurance). Raw materials and intermediate goods: (M) is the cost of all inputs in the production activity. This is usually an item directly taken from the financial statements. Finished goods and materials purchased to resell: (S) is the cost of all finished goods and materials purchased to be resold. This is usually an item directly taken from the financial statements. Electricity is the total annual cost of electric energy purchased from public or private utility companies or received from other establishments that belong to the same firm. Exclude the value of electricity generated and used at this establishment. Fuel (M) is the total annual cost of all fuels consumed for heat, power, transportation, or the generation of electricity. Do not include the estimated costs of fuels, such as sawdust or blast furnace gas, produced as a byproduct of your manufacturing activities. Include anthracite and bituminous coal, coke, natural and manufactured gas, fuel oil, liquefied petroleum gas, gasoline, and all other fuels, including purchased steam. Be sure to include fuel used to power delivery trucks, forklifts, or other motor vehicles associated with the establishment. Other costs of production not included above: (M) this should be computed as total costs of production minus the items included above.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.