IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UGA_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Uganda, 2013
Get Microdata
Reference ID
UGA_2013_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Apr 07, 2014
Last modified
Mar 29, 2019
Page views
14666
Downloads
1930
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Uganda-2013-full
    data

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: Uganda-2013-full data

Overview

Valid: 61
Invalid: 579
Type: Discrete
Decimal: 0
Start: 456
End: 458
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category
-9 DK
-6 Still in process
-5 Application denied
1 Less than one day
4
6
7
10
14
21
24
28
30
39
60
90
120
180
270
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Waiting time for construction permit. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.