IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GMB_2012_WBCS_V01_M / variable [F2]
central

World Bank Country Survey 2012

Gambia, The, 2012
Get Microdata
Reference ID
GMB_2012_WBCS_v01_M
Producer(s)
Public Opinion Research Group
Metadata
DDI/XML JSON
Created on
Apr 07, 2014
Last modified
Mar 29, 2019
Page views
9499
Downloads
361
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Gambia FY12
    datafile FINAL

Poor donor coordination (g3_4)

Data file: Gambia FY12 datafile FINAL

Overview

Valid: 135
Invalid: 15
Minimum: 0
Maximum: 1
Type: Discrete
Decimal: 0
Start: 432
End: 432
Width: 1
Range: -
Format:

Questions and instructions

Literal question
SECTION G: THE FUTURE ROLE OF THE WORLD BANK IN THE GAMBIA

G3. When World Bank assisted reform efforts fail or are slow to take place, which TWO of the following would you attribute this to? (Choose TWO only)
4. Poor donor coordination
Categories
Value Category
0 Unchecked
1 Checked
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.