IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MMR_2014_MS_V01_M / variable [F1]
central

Micro-Enterprise Survey 2014

Myanmar, 2014
Get Microdata
Reference ID
MMR_2014_MS_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Sep 05, 2014
Last modified
Mar 29, 2019
Page views
10389
Downloads
853
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Myanmar_Micro-2014-full
    data

Wait for electrical connection (c4)

Data file: Myanmar_Micro-2014-full data

Overview

Valid: 16
Invalid: 444
Type: Discrete
Decimal: 0
Start: 141
End: 143
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know
-6 Still in process
-5 Application dented
1 Less than one day
3
7
14
15
30
35
60
180
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for electrical connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.