IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / YEM_2010-2013_ES-P_V01_M / variable [F2]
central

Enterprise Survey 2010-2013

Yemen, Rep., 2010 - 2014
Get Microdata
Reference ID
YEM_2010-2013_ES-P_v01_M
Producer(s)
World Bank, European Bank for Reconstruction and Development, European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 29, 2016
Last modified
Mar 29, 2019
Page views
10547
Downloads
1269
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Yemen_2010_2013_Panel

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Yemen_2010_2013_Panel

Overview

Valid: 41
Invalid: 789
Type: Discrete
Decimal: 0
Start: 396
End: 398
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know (SPONTANEOUS)
-6 STILL IN PROCESS
-5 APPLICATION DENIED
1 LESS THAN ONE DAY
4
5
6
7
15
30
60
65
90
120
140
300
460
730
900
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for water connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.