IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MKD_2009_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2009

Macedonia, FYR, 2008 - 2009
Get Microdata
Reference ID
MKD_2009_ES_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website Interactive tools
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
14941
Downloads
1169
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Macedonia,
    FYR-2009--full
    data-

total annual costs of water in last fiscal year (n2h)

Data file: Macedonia, FYR-2009--full data-

Overview

Valid: 115
Invalid: 251
Type: Discrete
Decimal: 0
Start: 1018
End: 1024
Width: 7
Range: -
Format:

Questions and instructions

Literal question
For fiscal year 2007, please provide the following information about this establishment:
Total annual costs of water
Categories
Value Category
-9 don't know
1000
2100
2568
3600
4000
4800
6000
6500
10000
11825
12000
13000
15000
17000
18000
18104
20000
20765
22451
24000
25000
30000
30500
36000
37000
40000
42508
43000
48000
50000
51240
52403
56000
60000
65000
65200
70000
72000
80000
82000
86173
94000
96000
100000
120000
128402
140000
146000
150000
175000
200000
241875
300000
330000
350000
360000
365536
462804
500000
720000
1500000
2350536
2400000
2500000
3000000
6201000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Total cost of labor, including wages, salaries and benefits is the total annual wages and all annual benefits, including food, transport, social security (i.e. pensions, medical insurance, and unemployment insurance).

Raw materials and intermediate goods (M) is the cost of all inputs in the production activity. This is usually an item directly taken from the financial statements

Total annual cost of finished goods and materials purchased to resell: (S) is the cost of all finished goods and materials purchased to be resold.

Fuel (M) is the total annual cost of all fuels consumed for heat, power, transportation, or the generation of electricity. Do not include the estimated costs of fuels, such as sawdust or blast furnace gas, produced as a byproduct of your manufacturing activities. Include anthracite and bituminous coal, coke, natural and manufactured gas, fuel oil, liquefied petroleum gas, gasoline, and all other fuels, including purchased steam. Be sure to include fuel used to power delivery trucks, fork lifts, or other motor vehicles associated with the establishment.

Electricity is the total annual cost of electric energy purchased from public or private utility companies or received from other establishments that belong to the same firm. Exclude the value of electricity generated and used at this establishment.

Total annual depreciation is the amortization of fixed assets due to the wearing down and/or obsolescence
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.