IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2013_HRBF-HP_V01_M / variable [F3]
central

Community Performance-Based Financing Impact Evaluation 2013

Rwanda, 2013 - 2014
Get Microdata
Reference ID
RWA_2013_HRBF-HP_v01_M
Producer(s)
Gil Shapira, Ina Kalisa
Metadata
DDI/XML JSON
Created on
Jan 18, 2017
Last modified
Mar 29, 2019
Page views
87387
Downloads
1259
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • chw
  • coop
  • f1
  • f2
  • f3
  • f4

(1.04) Last major renovation: a) Month (f1_01_04a)

Data file: f1

Overview

Valid: 170
Invalid: 28
Minimum: 1
Maximum: 12
Type: Discrete
Decimal: 0
Start: 115
End: 116
Width: 2
Range: -
Format:

Questions and instructions

Literal question
À quand remonte le dernier investissement important réalisé dans les infrastructures ?
- MOIS (MM)
Categories
Value Category
0 None
1
2
3
4
5
6
7
8
9
10
11
12
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
ENQUÊTEUR : NOTER LE MOIS ET L'ANNÉE. COMPTER LES GROS TRAVAUX DE PEINTURE, LA PLOMBERIE, LES TRAVAUX D'AGRANDISSEMENT, ETC.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.