IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PHL_2015_ES_V01_M / variable [F3]
central

Enterprise Survey 2015

Philippines, 2014 - 2016
Get Microdata
Reference ID
PHL_2015_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jun 26, 2017
Last modified
Jun 26, 2017
Page views
11511
Downloads
324
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • philippines_2015_full_data

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: philippines_2015_full_data

Overview

Valid: 101
Invalid: 1234
Type: Discrete
Decimal: 0
Start: 265
End: 267
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know (spontaneous)
-8 Refusal (spontaneous)
-7 Does not apply
-6
1
2
3
4
5
7
10
14
15
18
20
21
30
60
72
75
90
100
180
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for electrical connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.