IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MYS_2015_ES_V01_M / variable [F5]
central

Enterprise Survey 2015

Malaysia, 2015 - 2016
Get Microdata
Reference ID
MYS_2015_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jun 26, 2017
Last modified
Jun 26, 2017
Page views
12260
Downloads
325
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • malaysia_2015_full_data

In last FY, value of losses due to power outages (c9b)

Data file: malaysia_2015_full_data

Overview

Valid: 14
Invalid: 986
Type: Discrete
Decimal: 0
Start: 204
End: 209
Width: 6
Range: -
Format:

Questions and instructions

Literal question
Please estimate the losses that resulted from power outages either as a percentage of total annual sales or as total annual losses.
Annual losses due to power outages
Categories
Value Category
-9 Don't know (spontaneous)
-8 Refusal (spontaneous)
-7 Does not apply
0
50
500
1000
5000
10000
25000
300000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Losses because of power outages: The Manager should estimate the amount of production lost because of power outages.
Question post text
PROVIDE EITHER ONE OR THE OTHER, NOT BOTH c9a or c9b
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.